Product Overview
The CreativeSafetySupply Project Planning Portrait Whiteboard - 60"x 40" is a Dry Erase Boards product by CreativeSafetySupply. It features magnetic dry-erase surface – vinyl-printed surface resists stains and ghosting.
Key Features
- Magnetic Dry-Erase Surface – Vinyl-printed surface resists stains and ghosting for long-term visibility and smooth writing performance
- Easy Installation – Includes mounting brackets and hardware for secure and hassle-free wall mounting
- Durable Aluminum Frame – 1" aluminum border paired with a 2.5" deep aluminum tray for convenient accessory storage
- Usable Writing Surface – Writing area measures 2" less than the board's total dimensions
- Please inspect your whiteboard upon arrival – If you notice any issues, please contact us through Amazon's Buyer-Seller Messaging system
Why Choose the CreativeSafetySupply Project Planning Portrait Whiteboard - 60"x 40"
The CreativeSafetySupply Project Planning Portrait Whiteboard - 60"x 40" offers magnetic dry-erase surface – vinyl-printed surface resists stains and easy installation – includes mounting brackets and hardware. These features make the CreativeSafetySupply Project Planning Portrait Whiteboard - 60"x 40" a strong option in the Dry Erase Boards category.
Best For
The CreativeSafetySupply Project Planning Portrait Whiteboard - 60"x 40" is best suited for: Office.
Quick Summary
The CreativeSafetySupply Project Planning Portrait Whiteboard - 60"x 40" is a Dry Erase Boards product by CreativeSafetySupply. Brand: Creative Safety Supply. Color: White. Material: Aluminum, Metal, Vinyl. Recommended Uses For Product: Office. Mounting Type: Wall Mount.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Creative Safety Supply |
| Color | White |
| Material | Aluminum, Metal, Vinyl |
| Recommended Uses For Product | Office |
| Mounting Type | Wall Mount |